Clinton Utility Board’s (CUB) main office building, as well as a new 21,000 SF LEED Certified facility for CUB’s Engineering & Operations (E&O) facility.

The $5 million, LEED Certified project incorporates environmentally and economically responsible features such as a highly efficient HVAC system, LED lighting, exterior sunshades and low e-glass, regional building materials with a high recycled content, and low flow plumbing fixtures.

 

Location

Clinton, TN

Designer

Studio Four Design